About SEDA Policies Feed-in Tariff (FiT) Net Metering Statistics & Monitoring Download & Media Directory Events & Trainings
Download & Media
Guidelines
FiT Guidelines
Power Systems Study Guideline
Guideline for ST provisional license
Guideline for ST Permanent License 2015
TNB Interconnection Guidebook (PV)
Procedure For The T&C Of GCPV
Guideline for Biomass & Biogas Acceptance Test
Home owner's guideline for Solar PV
Step-by-Step Guidelines
Guideline for the T&C of Small Hydro
Forms
FiT Application Form
ST's License Form
Standardized REPPAs
Save Rebate Program (Chiller)
Registered PV Service Provider Form
Presentation Materials
SEDA Annual Report
Annual Report 2015
Annual Report 2014
Annual Report 2013
Annual Report 2012
Annual Report 2011
Other Information
Media
Press Releases
News
Jobs@SEDA
Advertisements
Magazine
Sustainable Energy Malaysia Vol. 1 Issue 1


Home  »  Download & Media  »  Forms  »  ST's License Form


ST 's License Form
 

The Energy Commission (Suruhanjaya Tenaga or ST) is a statutory body with the role to regulate the energy sector in Malaysia, specifically the electricity supply industry and piped gas supply industry in the Peninsular and Sabah. The Energy Commission is responsible to ensure that the supply of electricity and piped gas to consumers is reliable, safe and at reasonable prices.

"Public installation" is an installation carried out by the licensee to supply electricity to any person other than licensee: provided that licensee can use the electricity for specific purposes as long as the use is consistent with the terms of the licence.

Visit ST's website     |    Download ST's License Application Form

 
Copyright © 2017 SEDA Malaysia. All Rights Reserved.
Terms and Conditions of Use Links Enquiry Contact Us FAQs Sitemap