About SEDA Malaysia Policies Feed-in Tariff (FiT) Statistics & Monitoring Download Directory Media Events & Trainings
Call for Paper – International Sustainable Energy Summit (ISES) 2012   18/05/2012
Updated: Call for Proposal - To Develop a Comprehensive Wind Map for Malaysia   11/05/2012
Jobs@SEDA - Jobs Opportunities at SEDA Malaysia   03/05/2012
Call for Proposal - To Develop a Comprehensive Wind Map for Malaysia   30/04/2012
The e-FiT system will be undergoing system maintenance on May 2 - 3, 2012   27/04/2012
 
U.S. Solar Tariffs on Chinese Cells May Boost Prices   18/05/2012
Boosting energy efficiency   16/05/2012
Malaysia's chips sector a plus point in green tech shift, says expert   16/05/2012
Power users to earn rebates   16/05/2012
10 Questions with SEDA Malaysia Chairman, Tan Sri Dr Fong Chan Onn   14/05/2012
 
Best view with resolution of 1024 x 768 (or higher) and supports Internet Explorer 8.0+ or Firefox 3.0+
 

FiT Rates for Biogas (16 years from FiT Commencement Date)
Description of Qualifying Renewable Energy Installation FiT Rates (RM per kWh)
(a) Basic FiT rates having installed capacity of : 2012 2013 2014
(i)
up to and including 4MW
0.3200 0.3184 0.3168
(ii)
above 4MW and up to and including 10MW
0.3000 0.2985 0.2970
(iii)
above 10MW and up to and including 30MW
0.2800 0.2786 0.2772
(b) Bonus FiT rates having the following criteria (one or more) : 2012 2013 2014
(i)
use of gas engine technology with electrical efficiency of above 40%
+0.0200 +0.0199 +0.0198
(ii)
use of locally manufactured or assembled gas engine technology
+0.0100 +0.0100 +0.0099
(iii)
use of landfill or sewage gas as fuel source
+0.0800 +0.0786 +0.0771
FiT Rates for Biomass (16 years from FiT Commencement Date)
Description of Qualifying Renewable Energy Installation FiT Rates (RM per kWh)
(a) Basic FiT rates having installed capacity of : 2012 2013 2014
(i)
up to and including 10MW
0.3100 0.3085 0.3069
(ii)
above 10MW and up to and including 20MW
0.2900 0.2886 0.2871
(iii)
above 20MW and up to and including 30MW
0.2700 0.2687 0.2673
(b) Bonus FiT rates having the following criteria (one or more) : 2012 2013 2014
(i)
use of gasification technology
+0.0200 +0.0199 +0.0198
(ii)
use of steam-based electricity generating systems with overall efficiency of above 14%
+0.0100 +0.0100 +0.0099
(iii)
use of locally manufactured or assembled gasification technology
+0.0100 +0.0100 +0.0099
(iv)
use of municipal solid waste as fuel source
+0.1000 +0.0982 +0.0964
FiT Rates for Small Hydro (21 years from FiT Commencement Date)
Description of Qualifying Renewable Energy Installation FiT Rates (RM per kWh)
(a) Basic FiT rates having installed capacity of : 2012 2013 2014
(i)
up to and including 10MW
0.2400 0.2400 0.2400
(ii)
above 10MW and up to and including 30MW
0.2300 0.2300 0.2300
FiT Rates for Solar PV (21 years from FiT Commencement Date)
Description of Qualifying Renewable Energy Installation FiT Rates (RM per kWh)
(a) Basic FiT rates having installed capacity of : 2012 2013 2014
(i)
up to and including 4kW
1.2300 1.1316 1.0411
(ii)
above 4kW and up to and including 24kW
1.2000 1.1040 1.0157
(iii)
above 24kW and up to and including 72kW
1.1800 1.0856 0.9988
(iv)
above 72kW and up to and including 1MW
1.1400 1.0488 0.9649
(v)
above 1MW and up to and including 10MW
0.9500 0.8740 0.8041
(vi)
above 10MW and up to and including 30MW
0.8500 0.7820 0.7194
(b) Bonus FiT rates having the following criteria (one or more) : 2012 2013 2014
(i)
use as installation in buildings or building structures
+0.2600 +0.2392 +0.2201
(ii)
use as building materials
+0.2500 +0.2300 +0.2116
(iii)
use of locally manufactured or assembled solar PV modules
+0.0300 +0.0276 +0.0254
(iv)
use of locally manufactured or assembled solar inverters
+0.0100 +0.0092 +0.0085




 
Copyright © 2012 SEDA Malaysia. All Rights Reserved.