About SEDA Malaysia Policies Feed-in Tariff (FiT) Statistics & Monitoring Download Directory Media Events & Trainings
Press Release: SEDA announces critical dates for quota release for solar PV (non-individuals & community) and non-Solar PV quota   24/01/2015
Opening of Solar PV quota for non-individuals with capacity above 425kW up to and including 1MW – updated 22 January 2015   22/01/2015
2015 Solar PV Quota have been allocated to Individual FiA applications from registered Service Providers   12/01/2015
2015 FiT rate for Solar PV has been gazetted & Solar PV Quota will be allocated to qualified FiA applications starting from 12 January 2015   05/01/2015
ASEAN ENERGY AWARDS 2015 – RENEWABLE ENERGY CATEGORY   02/01/2015
Public Survey: Environment, Energy, and Green Electricity   31/12/2014
Higher Installed Capacity Limit for Feed-in Tariff under Community quota   26/12/2014
2015 Registered PV Service Provider Directory open for registration   22/12/2014
 
Renewable energy applications surge to 932MW   25/01/2015
Kementerian Terima Permohonan Jana 932MW Tenaga Elektrik Guna Sumber Diperbaharui   24/01/2015
Sumbang 11%   20/01/2015
MIDA Gesa Tingkat Sumbangan Tenaga Boleh Baharu   19/01/2015
Kaji bina sistem tenaga solar di pusat pemindahan banjir   13/01/2015
Ongkili: More companies using solar power for Sabah electricity   13/01/2015
Majunaka Labur RM106 Juta Bina Janakuasa Berasaskan Sekam Padi Di Kedah   07/01/2015
UMS komited lebih efisien dalam penggunaan tenaga   09/12/2014
 
Best view with resolution of 1024 x 768 (or higher) and supports Internet Explorer 8.0+ or Firefox 3.0+
 

FiT Rates for Solar PV (Community) (21 years from FiT Commencement Date)
Description of Qualifying Renewable Energy Installation FiT Rates (RM per kWh)
(a) Basic FiT rates having installed capacity of :
(i)
up to and including 4kW
0.9166
(ii)
above 4kW and up to and including 24kW
0.8942
(iii)
above 24kW and up to and including 72kW
0.7222
(i)
up to and including 4kW
1.0184
(ii)
above 4kW and up to and including 24kW
0.9936
(b) Bonus FiT rates having the following criteria (one or more) :
(i)
use as installation in buildings or building structures
+0.1722
(ii)
use as building materials
+0.1656
(iii)
use of locally manufactured or assembled solar PV modules
+0.0500
(iv)
use of locally manufactured or assembled solar inverters
+0.0500
(i)
use as installation in buildings or building structures
+0.2153
(ii)
use as building materials
+0.2070
(iii)
use of locally manufactured or assembled solar PV modules
+0.0500
(iv)
use of locally manufactured or assembled solar inverters
+0.0500
FiT Rates for Solar PV (Individual) (21 years from FiT Commencement Date)
Description of Qualifying Renewable Energy Installation FiT Rates (RM per kWh)
(a) Basic FiT rates having installed capacity of :
(i)
up to and including 4kW
0.9166
(ii)
above 4kW and up to and including 12kW
0.8942
(i)
up to and including 4kW
1.0184
(ii)
above 4kW and up to and including 12kW
0.9936
(i)
up to and including 4kW
1.0411
(ii)
above 4kW and up to and including 24kW
1.0157
(iii)
above 24kW and up to and including 72kW
0.7552
(iv)
above 72kW and up to and including 1MW
0.7296
(v)
above 1MW and up to and including 10MW
0.6080
(vi)
above 10MW and up to and including 30MW
0.5440
(i)
up to and including 4kW
1.1316
(ii)
above 4kW and up to and including 24kW
1.1040
(iii)
above 24kW and up to and including 72kW
0.9440
(iv)
above 72kW and up to and including 1MW
0.9120
(v)
above 1MW and up to and including 10MW
0.7600
(vi)
above 10MW and up to and including 30MW
0.6800
(i)
up to and including 4kW
1.1316
(ii)
above 4kW and up to and including 24kW
1.1040
(iii)
above 24kW and up to and including 72kW
1.0856
(iv)
above 72kW and up to and including 1MW
1.0488
(v)
above 1MW and up to and including 10MW
0.8740
(vi)
above 10MW and up to and including 30MW
0.7820
(i)
up to and including 4kW
1.2300
(ii)
above 4kW and up to and including 24kW
1.2000
(iii)
above 24kW and up to and including 72kW
1.1800
(iv)
above 72kW and up to and including 1MW
1.1400
(v)
above 1MW and up to and including 10MW
0.9500
(vi)
above 10MW and up to and including 30MW
0.8500
(b) Bonus FiT rates having the following criteria (one or more) :
(i)
use as installation in buildings or building structures
+0.1722
(ii)
use as building materials
+0.1656
(iii)
use of locally manufactured or assembled solar PV modules
+0.0500
(iv)
use of locally manufactured or assembled solar inverters
+0.0500
(i)
use as installation in buildings or building structures
+0.2153
(ii)
use as building materials
+0.2070
(iii)
use of locally manufactured or assembled solar PV modules
+0.0500
(iv)
use of locally manufactured or assembled solar inverters
+0.0500
(i)
use as installation in buildings or building structures
+0.2201
(ii)
use as building materials
+0.2116
(iii)
use of locally manufactured or assembled solar PV modules
+0.0300
(iv)
use of locally manufactured or assembled solar inverters
+0.0100
(i)
use as installation in buildings or building structures
+0.2392
(ii)
use as building materials
+0.2300
(iii)
use of locally manufactured or assembled solar PV modules
+0.0300
(iv)
use of locally manufactured or assembled solar inverters
+0.0100
(i)
use as installation in buildings or building structures
+0.2392
(ii)
use as building materials
+0.2300
(iii)
use of locally manufactured or assembled solar PV modules
+0.0276
(iv)
use of locally manufactured or assembled solar inverters
+0.0092
(i)
use as installation in buildings or building structures
+0.2600
(ii)
use as building materials
+0.2500
(iii)
use of locally manufactured or assembled solar PV modules
+0.0300
(iv)
use of locally manufactured or assembled solar inverters
+0.0100
FiT Rates for Solar PV (Non-individual (≤ 500 kW)) (21 years from FiT Commencement Date)
Description of Qualifying Renewable Energy Installation FiT Rates (RM per kWh)
(a) Basic FiT rates having installed capacity of :
(i)
up to and including 4kW
0.9166
(ii)
above 4kW and up to and including 24kW
0.8942
(iii)
above 24kW and up to and including 72kW
0.7222
(iv)
above 72kW and up to and including 1MW
0.6977
(v)
above 1MW and up to and including 10MW
0.5472
(vi)
above 10MW and up to and including 30MW
0.4896
(i)
up to and including 4kW
1.0184
(ii)
above 4kW and up to and including 24kW
0.9936
(iii)
above 24kW and up to and including 72kW
0.8496
(iv)
above 72kW and up to and including 1MW
0.8208
(v)
above 1MW and up to and including 10MW
0.6840
(vi)
above 10MW and up to and including 30MW
0.6120
(i)
up to and including 4kW
1.0411
(ii)
above 4kW and up to and including 24kW
1.0157
(iii)
above 24kW and up to and including 72kW
0.7552
(iv)
above 72kW and up to and including 1MW
0.7296
(v)
above 1MW and up to and including 10MW
0.6080
(vi)
above 10MW and up to and including 30MW
0.5440
(i)
up to and including 4kW
1.1316
(ii)
above 4kW and up to and including 24kW
1.1040
(iii)
above 24kW and up to and including 72kW
0.9440
(iv)
above 72kW and up to and including 1MW
0.9120
(v)
above 1MW and up to and including 10MW
0.7600
(vi)
above 10MW and up to and including 30MW
0.6800
(i)
up to and including 4kW
1.1316
(ii)
above 4kW and up to and including 24kW
1.1040
(iii)
above 24kW and up to and including 72kW
1.0856
(iv)
above 72kW and up to and including 1MW
1.0488
(v)
above 1MW and up to and including 10MW
0.8740
(vi)
above 10MW and up to and including 30MW
0.7820
(i)
up to and including 4kW
1.2300
(ii)
above 4kW and up to and including 24kW
1.2000
(iii)
above 24kW and up to and including 72kW
1.1800
(iv)
above 72kW and up to and including 1MW
1.1400
(v)
above 1MW and up to and including 10MW
0.9500
(vi)
above 10MW and up to and including 30MW
0.8500
(b) Bonus FiT rates having the following criteria (one or more) :
(i)
use as installation in buildings or building structures
+0.1722
(ii)
use as building materials
+0.1656
(iii)
use of locally manufactured or assembled solar PV modules
+0.0500
(iv)
use of locally manufactured or assembled solar inverters
+0.0500
(i)
use as installation in buildings or building structures
+0.2153
(ii)
use as building materials
+0.2070
(iii)
use of locally manufactured or assembled solar PV modules
+0.0500
(iv)
use of locally manufactured or assembled solar inverters
+0.0500
(i)
use as installation in buildings or building structures
+0.2201
(ii)
use as building materials
+0.2116
(iii)
use of locally manufactured or assembled solar PV modules
+0.0300
(iv)
use of locally manufactured or assembled solar inverters
+0.0100
(i)
use as installation in buildings or building structures
+0.2392
(ii)
use as building materials
+0.2300
(iii)
use of locally manufactured or assembled solar PV modules
+0.0300
(iv)
use of locally manufactured or assembled solar inverters
+0.0100
(i)
use as installation in buildings or building structures
+0.2392
(ii)
use as building materials
+0.2300
(iii)
use of locally manufactured or assembled solar PV modules
+0.0276
(iv)
use of locally manufactured or assembled solar inverters
+0.0092
(i)
use as installation in buildings or building structures
+0.2600
(ii)
use as building materials
+0.2500
(iii)
use of locally manufactured or assembled solar PV modules
+0.0300
(iv)
use of locally manufactured or assembled solar inverters
+0.0100
FiT Rates for Solar PV (Non-individual (> 500 kW)) (21 years from FiT Commencement Date)
Description of Qualifying Renewable Energy Installation FiT Rates (RM per kWh)
(a) Basic FiT rates having installed capacity of :
(i)
up to and including 4kW
0.9166
(ii)
above 4kW and up to and including 24kW
0.8942
(iii)
above 24kW and up to and including 72kW
0.7222
(iv)
above 72kW and up to and including 1MW
0.6977
(v)
above 1MW and up to and including 10MW
0.5472
(vi)
above 10MW and up to and including 30MW
0.4896
(i)
up to and including 4kW
1.0184
(ii)
above 4kW and up to and including 24kW
0.9936
(iii)
above 24kW and up to and including 72kW
0.8496
(iv)
above 72kW and up to and including 1MW
0.8208
(v)
above 1MW and up to and including 10MW
0.6840
(vi)
above 10MW and up to and including 30MW
0.6120
(i)
up to and including 4kW
1.0411
(ii)
above 4kW and up to and including 24kW
1.0157
(iii)
above 24kW and up to and including 72kW
0.7552
(iv)
above 72kW and up to and including 1MW
0.7296
(v)
above 1MW and up to and including 10MW
0.6080
(vi)
above 10MW and up to and including 30MW
0.5440
(i)
up to and including 4kW
1.1316
(ii)
above 4kW and up to and including 24kW
1.1040
(iii)
above 24kW and up to and including 72kW
0.9440
(iv)
above 72kW and up to and including 1MW
0.9120
(v)
above 1MW and up to and including 10MW
0.7600
(vi)
above 10MW and up to and including 30MW
0.6800
(i)
up to and including 4kW
1.1316
(ii)
above 4kW and up to and including 24kW
1.1040
(iii)
above 24kW and up to and including 72kW
1.0856
(iv)
above 72kW and up to and including 1MW
1.0488
(v)
above 1MW and up to and including 10MW
0.8740
(vi)
above 10MW and up to and including 30MW
0.7820
(i)
up to and including 4kW
1.2300
(ii)
above 4kW and up to and including 24kW
1.2000
(iii)
above 24kW and up to and including 72kW
1.1800
(iv)
above 72kW and up to and including 1MW
1.1400
(v)
above 1MW and up to and including 10MW
0.9500
(vi)
above 10MW and up to and including 30MW
0.8500
(b) Bonus FiT rates having the following criteria (one or more) :
(i)
use as installation in buildings or building structures
+0.1722
(ii)
use as building materials
+0.1656
(iii)
use of locally manufactured or assembled solar PV modules
+0.0500
(iv)
use of locally manufactured or assembled solar inverters
+0.0500
(i)
use as installation in buildings or building structures
+0.2153
(ii)
use as building materials
+0.2070
(iii)
use of locally manufactured or assembled solar PV modules
+0.0500
(iv)
use of locally manufactured or assembled solar inverters
+0.0500
(i)
use as installation in buildings or building structures
+0.2201
(ii)
use as building materials
+0.2116
(iii)
use of locally manufactured or assembled solar PV modules
+0.0300
(iv)
use of locally manufactured or assembled solar inverters
+0.0100
(i)
use as installation in buildings or building structures
+0.2392
(ii)
use as building materials
+0.2300
(iii)
use of locally manufactured or assembled solar PV modules
+0.0300
(iv)
use of locally manufactured or assembled solar inverters
+0.0100
(i)
use as installation in buildings or building structures
+0.2392
(ii)
use as building materials
+0.2300
(iii)
use of locally manufactured or assembled solar PV modules
+0.0276
(iv)
use of locally manufactured or assembled solar inverters
+0.0092
(i)
use as installation in buildings or building structures
+0.2600
(ii)
use as building materials
+0.2500
(iii)
use of locally manufactured or assembled solar PV modules
+0.0300
(iv)
use of locally manufactured or assembled solar inverters
+0.0100
FiT Rates for Biogas (16 years from FiT Commencement Date)
Description of Qualifying Renewable Energy Installation FiT Rates (RM per kWh)
(a) Basic FiT rates having installed capacity of :
(i)
up to and including 4MW
0.3184
(ii)
above 4MW and up to and including 10MW
0.2985
(iii)
above 10MW and up to and including 30MW
0.2786
(i)
up to and including 4MW
0.3184
(ii)
above 4MW and up to and including 10MW
0.2985
(iii)
above 10MW and up to and including 30MW
0.2786
(i)
up to and including 4MW
0.3184
(ii)
above 4MW and up to and including 10MW
0.2985
(iii)
above 10MW and up to and including 30MW
0.2786
(i)
up to and including 4MW
0.3184
(ii)
above 4MW and up to and including 10MW
0.2985
(iii)
above 10MW and up to and including 30MW
0.2786
(i)
up to and including 4MW
0.3200
(ii)
above 4MW and up to and including 10MW
0.3000
(iii)
above 10MW and up to and including 30MW
0.2800
(b) Bonus FiT rates having the following criteria (one or more) :
(i)
use of gas engine technology with electrical efficiency of above 40%
+0.0199
(ii)
use of locally manufactured or assembled gas engine technology
+0.0500
(i)
use of gas engine technology with electrical efficiency of above 40%
+0.0199
(ii)
use of locally manufactured or assembled gas engine technology
+0.0500
(i)
use of gas engine technology with electrical efficiency of above 40%
+0.0199
(ii)
use of locally manufactured or assembled gas engine technology
+0.0500
(i)
use of gas engine technology with electrical efficiency of above 40%
+0.0199
(ii)
use of locally manufactured or assembled gas engine technology
+0.0100
(i)
use of gas engine technology with electrical efficiency of above 40%
+0.0200
(ii)
use of locally manufactured or assembled gas engine technology
+0.0100
FiT Rates for Biogas ( Landfill / Agri Waste ) (16 years from FiT Commencement Date)
Description of Qualifying Renewable Energy Installation FiT Rates (RM per kWh)
(a) Basic FiT rates having installed capacity of :
(i)
up to and including 4MW
0.3184
(ii)
above 4MW and up to and including 10MW
0.2985
(iii)
above 10MW and up to and including 30MW
0.2786
(i)
up to and including 4MW
0.3184
(ii)
above 4MW and up to and including 10MW
0.2985
(iii)
above 10MW and up to and including 30MW
0.2786
(i)
up to and including 4MW
0.3184
(ii)
above 4MW and up to and including 10MW
0.2985
(iii)
above 10MW and up to and including 30MW
0.2786
(i)
up to and including 4MW
0.3184
(ii)
above 4MW and up to and including 10MW
0.2985
(iii)
above 10MW and up to and including 30MW
0.2786
(i)
up to and including 4MW
0.3200
(ii)
above 4MW and up to and including 10MW
0.3000
(iii)
above 10MW and up to and including 30MW
0.2800
(b) Bonus FiT rates having the following criteria (one or more) :
(i)
use of gas engine technology with electrical efficiency of above 40%
+0.0199
(ii)
use of locally manufactured or assembled gas engine technology
+0.0500
(iii)
use of landfill, sewage gas or agricultural waste including animal waste as fuel source
+0.0786
(i)
use of gas engine technology with electrical efficiency of above 40%
+0.0199
(ii)
use of locally manufactured or assembled gas engine technology
+0.0500
(iii)
use of landfill, sewage gas or agricultural waste including animal waste as fuel source
+0.0786
(i)
use of gas engine technology with electrical efficiency of above 40%
+0.0199
(ii)
use of locally manufactured or assembled gas engine technology
+0.0500
(iii)
use of landfill, sewage gas or agricultural waste including animal waste as fuel source
+0.0786
(i)
use of gas engine technology with electrical efficiency of above 40%
+0.0199
(ii)
use of locally manufactured or assembled gas engine technology
+0.0100
(iii)
use of landfill, sewage gas or agricultural waste including animal waste as fuel source
+0.0786
(i)
use of gas engine technology with electrical efficiency of above 40%
+0.0200
(ii)
use of locally manufactured or assembled gas engine technology
+0.0100
(iii)
use of landfill, sewage gas or agricultural waste including animal waste as fuel source
+0.0800
FiT Rates for Biomass (16 years from FiT Commencement Date)
Description of Qualifying Renewable Energy Installation FiT Rates (RM per kWh)
(a) Basic FiT rates having installed capacity of :
(i)
up to and including 10MW
0.3085
(ii)
above 10MW and up to and including 20MW
0.2886
(iii)
above 20MW and up to and including 30MW
0.2687
(i)
up to and including 10MW
0.3085
(ii)
above 10MW and up to and including 20MW
0.2886
(iii)
above 20MW and up to and including 30MW
0.2687
(i)
up to and including 10MW
0.3085
(ii)
above 10MW and up to and including 20MW
0.2886
(iii)
above 20MW and up to and including 30MW
0.2687
(i)
up to and including 10MW
0.3100
(ii)
above 10MW and up to and including 20MW
0.2900
(iii)
above 20MW and up to and including 30MW
0.2700
(b) Bonus FiT rates having the following criteria (one or more) :
(i)
use of gasification technology
+0.0199
(ii)
use of steam-based electricity generating systems with overall efficiency of above 20%
+0.0100
(iii)
use of locally manufactured or assembled boiler or gasifier
+0.0500
(i)
use of gasification technology
+0.0199
(ii)
use of steam-based electricity generating systems with overall efficiency of above 20%
+0.0100
(iii)
use of locally manufactured or assembled boiler or gasifier
+0.0500
(i)
use of gasification technology
+0.0199
(ii)
use of steam-based electricity generating systems with overall efficiency of above 20%
+0.0100
(iii)
use of locally manufactured or assembled boiler or gasifier
+0.0100
(i)
use of gasification technology
+0.0200
(ii)
use of steam-based electricity generating systems with overall efficiency of above 20%
+0.0100
(iii)
use of locally manufactured or assembled boiler or gasifier
+0.0100
FiT Rates for Biomass ( Solid Waste ) (16 years from FiT Commencement Date)
Description of Qualifying Renewable Energy Installation FiT Rates (RM per kWh)
(a) Basic FiT rates having installed capacity of :
(i)
up to and including 10MW
0.3085
(ii)
above 10MW and up to and including 20MW
0.2886
(iii)
above 20MW and up to and including 30MW
0.2687
(i)
up to and including 10MW
0.3085
(ii)
above 10MW and up to and including 20MW
0.2886
(iii)
above 20MW and up to and including 30MW
0.2687
(i)
up to and including 10MW
0.3085
(ii)
above 10MW and up to and including 20MW
0.2886
(iii)
above 20MW and up to and including 30MW
0.2687
(i)
up to and including 10MW
0.3100
(ii)
above 10MW and up to and including 20MW
0.2900
(iii)
above 20MW and up to and including 30MW
0.2700
(b) Bonus FiT rates having the following criteria (one or more) :
(i)
use of gasification technology
+0.0199
(ii)
use of steam-based electricity generating systems with overall efficiency of above 20%
+0.0100
(iii)
use of locally manufactured or assembled boiler or gasifier
+0.0500
(iv)
use of solid waste as fuel source
+0.0982
(i)
use of gasification technology
+0.0199
(ii)
use of steam-based electricity generating systems with overall efficiency of above 20%
+0.0100
(iii)
use of locally manufactured or assembled boiler or gasifier
+0.0500
(iv)
use of solid waste as fuel source
+0.0982
(i)
use of gasification technology
+0.0199
(ii)
use of steam-based electricity generating systems with overall efficiency of above 20%
+0.0100
(iii)
use of locally manufactured or assembled boiler or gasifier
+0.0100
(iv)
use of solid waste as fuel source
+0.0982
(i)
use of gasification technology
+0.0200
(ii)
use of steam-based electricity generating systems with overall efficiency of above 20%
+0.0100
(iii)
use of locally manufactured or assembled boiler or gasifier
+0.0100
(iv)
use of solid waste as fuel source
+0.1000
FiT Rates for Small Hydro (21 years from FiT Commencement Date)
Description of Qualifying Renewable Energy Installation FiT Rates (RM per kWh)
(a) Basic FiT rates having installed capacity of :
(i)
up to and including 10MW
0.2400
(ii)
above 10MW and up to and including 30MW
0.2300
(i)
up to and including 10MW
0.2400
(ii)
above 10MW and up to and including 30MW
0.2300
(i)
up to and including 10MW
0.2400
(ii)
above 10MW and up to and including 30MW
0.2300
(i)
up to and including 10MW
0.2400
(ii)
above 10MW and up to and including 30MW
0.2300


The e-FiT system has been enhanced with a more user-friendly portal; displaying automatic real-time update of RE Quota on a separate RE Quota webpage.
Please click here to get the latest update of RE Quota available for any Feed-in Approval application and thereafter there is no necessity to refresh the RE Quota webpage.
 
Copyright © 2015 SEDA Malaysia. All Rights Reserved.
Terms and Conditions of Use Links Enquiry Contact Us FAQs Sitemap