About SEDA Policies Feed-in Tariff (FiT) Net Metering Statistics & Monitoring Download & Media Directory Events & Trainings
ANNOUNCEMENTS
Continuous Development Programme (CDP) for SEDA Malaysia Grid-Connected Solar PV Systems Design Qualified Persons (QPs)   20/07/2017
Jobs@SEDA - Assistant Director (Corporate Communication)   20/07/2017
Jobs@SEDA - Programmer   05/07/2017
Tawaran Penyertaan "Projek Sistem Pemantauan Solar PV Nasional dan Pengkalan Data" Kepada Pemegang Kelulusan Galakan (PKG/FiAH) yang Berminat (Kapasiti maksima 1000kW)   21/06/2017
Perolehan Hijau: Tawaran Sebut Harga bagi Perkhidmatan Menulis, Merekabentuk, Mencetak dan Membekal Majalah “Transitioning The Nation Towards Sustainable Energy Malaysia (TTNTSE)” untuk tahun 2017 dan 2018 bagi SEDA Malaysia   30/05/2017
Schedule for the Solar PV Community Quota Opening 2017   15/03/2017
Q&A Compilation and New TOR for RETR 2050   21/11/2016
Launching of eNEM online system for Net Energy Metering applications   31/10/2016


Home  »  Announcements


Opening of FiA (Individual) applications for Solar PV projects in Sabah and Federal Territory of Labuan and Registration for FiA (Community)
 

Putrajaya, 14 March 2015.

SEDA Malaysia is pleased to announce opening of the following Feed-in Approval applications :

Date Quota Solar PV Feed-in Approval application category

2.00 p.m.

16 March 2015

until

5.00 p.m.

19 April 2015

3MW

Feed-in Approval (Individual) application for Solar PV projects in Sabah and Federal Territory of Labuan shall be open for online submission into the e-FiT system.  Thereafter, all the submitted applications shall be processed and qualified applications shall be allocated Solar PV (Individual) quota by the end of April 2015.

Registration of Individual profile can only be done by SEDA Malaysia’s registered PV service providers using their respective SEDA Authorization Codes (SACs).  All service providers are required to regenerate their new SACs from the 2015 Registered PV Service Provider Directory by logging into their respective accounts. SAC will be required for update of Feed-in Approval application in the e-FiT system.

2.00 p.m.

16 March 2015

until

5.00 p.m.

31 August 2015

7MW

Profile registration of the following 3 communities intending to participate in the Feed-in Tariff programme under the Community category : 

  • EDU for Educational Institutions;
  • REL for Place for Worship
  • CARE for Care Centres

Profile of community participating in this Solar PV (Community) category must be approved by SEDA Malaysia before any Feed-in Approval (Community) application can be submitted for the Community Quota from early April 2015

Please take note that installed capacity limit for this category has been increased from 24kw to 48kw as per the announcement dated 26 December 2014.

Sustainable Energy Development Authority Malaysia (SEDA Malaysia)

 
Copyright © 2017 SEDA Malaysia. All Rights Reserved.
Terms and Conditions of Use Links Enquiry Contact Us FAQs Sitemap