About SEDA Policies Net Metering Feed-in Tariff (FiT) Statistics & Monitoring EE Download & Media Directory Events & Trainings
ANNOUNCEMENTS
Sebut Harga SEDA(SH)-11/2018 : Perolehan Hijau- Tawaran Sebutharga Membekal, Menghantar, Memasang, Menguji, Mentauliah serta Menyelenggara Server dan Menaik Taraf Sistem Email untuk SEDA Malaysia   16/08/2018
NEW TRAINING COURSE: "Operation & Maintenance of Biogas Power Plant Course"   02/08/2018
Sebut Harga SEDA(SH)-05/2018: Consultancy for Local Authorities Business Plan on Green Technology Incentive Scheme for Households and SMEs   01/08/2018
Sebut Harga SEDA(SH)-08/2018: Consultancy for Low Carbon Public Transport (Bus): Scaling-Up Financing and Viable Business Cases for Cities.   01/08/2018
Sebut Harga SEDA(SH)-09/2018: Project Consultancy for The Development of Low Carbon Cities Assessment and Accreditation Panel, Facilitator and Accessor/Verifier Training Curriculum Under ‘Train The Trainer’ Activity for GTALCC   31/07/2018
Sebut Harga SEDA(SH)-10/2018: Project Consultancy Work for The Study on an Institutional Framework for Low Carbon Cities   31/07/2018
Jobs@SEDA - Legal Advisor   25/07/2018
Jobs@SEDA - Audit Assistant – Internal Audit Unit   11/07/2018


Home  »  Announcements


Listing of Solar Photovoltaic (PV) Applications for Non-Individuals (up to 425 kW) for balloting on 9 March 2015
 

Putrajaya, 5 March 2015

SEDA Malaysia is pleased to inform that a total of 548 qualified Solar Photovoltaic (PV) Applications for Non-Individuals (up to 425 kW) were received for the balloting exercise. Out of this total, 182 applications were for installed capacity up to 72 kW, another 136 applications for installed capacity up to 180 kW and a balance of 230 applications were for installed capacity up to 425 kW. The list of qualified applications are as shown below :-

Category A : Solar Photovoltaic (PV) Application (up to and including 72 kW)

Category B : Solar Photovoltaic (PV) Application (above 72 kW, up to and including 180 kW)

Category C : Solar Photovoltaic (PV) Application (above 180 kW, up to and including 425 kW)

 

The balloting process will take place as scheduled according to the three categories. However, based on a directive by the Ministry of Energy, Green Technology and Water (KeTTHA) today, a special category for Sabah will be introduced whereby a total of 4 MW will be specifically allocated for this. A total of 69 qualified applications were received from Sabah for this year’s balloting process.

Sustainable Energy Development Authority Malaysia (SEDA Malaysia)

 
Copyright © 2018 SEDA Malaysia. All Rights Reserved.
Terms and Conditions of Use Links Enquiry Contact Us FAQs Sitemap