About SEDA Policies Net Metering Feed-in Tariff (FiT) Statistics & Monitoring Download & Media Directory Events & Trainings
ANNOUNCEMENTS
Continuous Development Programme (CDP) for SEDA Malaysia Grid-Connected Solar PV Systems Design Qualified Persons (QPs)   25/04/2018
Guideline on Solar Photovoltaic Installation under Net Energy Metering (NEM) Scheme, 8th February 2018.   16/03/2018
Seminar on Energy Audit Conditional Grant (Commercial & Industry) under the RMK-11   15/02/2018
Sebut Harga SEDA(SH)-01/2018:Tawaran Sebut Harga bagi Merekabentuk, Menterjemah, Mencetak dan Membekal Laporan Tahunan 2017 bagi SEDA Malaysia   05/02/2018
NEW TRAINING COURSE: "Operation & Maintenance of Biogas Power Plant Course"   14/12/2017
Guidelines for Eligibility of the S02 Bonus – “Use as Building Material” for Solar PV Applications under the Feed-in Tariff (FiT) Mechanism   06/12/2017
SEDA (SH) 09/ 2017 - Perolehan Hijau: Tawaran Sebut Harga Membekal, Menghantar, Memasang, Menguji, Mentauliah dan Menyelenggara Perkakasan ICT untuk SEDA Malaysia   30/10/2017
REGISTERED PV SERVICE PROVIDERS RENEWAL AND NEW REGISTRATION FOR THE YEAR 2018   25/10/2017


Home  »  Announcements


Listing of Solar Photovoltaic (PV) Applications for Non-Individuals (up to 425 kW) for balloting on 9 March 2015
 

Putrajaya, 5 March 2015

SEDA Malaysia is pleased to inform that a total of 548 qualified Solar Photovoltaic (PV) Applications for Non-Individuals (up to 425 kW) were received for the balloting exercise. Out of this total, 182 applications were for installed capacity up to 72 kW, another 136 applications for installed capacity up to 180 kW and a balance of 230 applications were for installed capacity up to 425 kW. The list of qualified applications are as shown below :-

Category A : Solar Photovoltaic (PV) Application (up to and including 72 kW)

Category B : Solar Photovoltaic (PV) Application (above 72 kW, up to and including 180 kW)

Category C : Solar Photovoltaic (PV) Application (above 180 kW, up to and including 425 kW)

 

The balloting process will take place as scheduled according to the three categories. However, based on a directive by the Ministry of Energy, Green Technology and Water (KeTTHA) today, a special category for Sabah will be introduced whereby a total of 4 MW will be specifically allocated for this. A total of 69 qualified applications were received from Sabah for this year’s balloting process.

Sustainable Energy Development Authority Malaysia (SEDA Malaysia)

 
Copyright © 2018 SEDA Malaysia. All Rights Reserved.
Terms and Conditions of Use Links Enquiry Contact Us FAQs Sitemap